      Installation and replacement process of basin support

      Source:Jiangsu Wanbao      Release date: 2021-05-21
      Whether it is an urban bridge or a highway bridge, continuous box girder is a commonly used structural form. In order to solve the vertical bearing capacity, horizontal displacement and rotation, the continuous box girder is currently commonly used basin-type rubber bearings. The installation and replacement of basin rubber bearings is an important part of bridge construction and maintenance, whic
      Whether it is an urban bridge or a highway bridge, continuous box girder is a commonly used structural form. In order to solve the vertical bearing capacity, horizontal displacement and rotation, the continuous box girder is currently commonly used basin-type rubber bearings. The installation and replacement of basin rubber bearings is an important part of bridge construction and maintenance, which has attracted wide attention from the industry.
      1. Determine the principled jacking plan based on the actual situation, that is, partial jacking or overall jacking. The advantage of local jacking is that it is easy to control the jacking and reduce equipment investment; the disadvantage is that jacking can easily lead to large deformation of the beam and a long construction period. The advantage of overall jacking is that it is easy to control the stress in the beam and the construction period is shorter, but more jacking equipment and personnel are required, and it is difficult to coordinate and control the deformation of various parts during the jacking process. If the design permits, try to give priority to partial jacking.
      2. Calculate the theoretical jacking reaction force value of each part according to the beam structure form and design parameters, and determine the appropriate number and model of jacks according to the reaction force. The basic principles of "large size, moderate quantity, and controllable grading" should be followed when selecting models.
      Large: It means to choose a jack model with a larger safety reserve factor as much as possible. For example, when choosing a jack, ensure that the actual jacking force is less than 75% of the theoretical jacking force.
      Moderate quantity: It means that it is not advisable to use more jacks to achieve the requirement of total jacking force, and at the same time, it should not be too few, that is, there should be at least one jack on both sides of each support. More jacks will make it difficult to work together, and too few jacks will cause difficulty in starting or once an individual jack fails, it will affect the entire jacking process.
      Hierarchical controllable: The jacking equipment with synchronous jacking information control system or the jack equipment with throttle control should be preferred to realize jacking synchronization or difference limit control.
      3. It is necessary to choose the setting position of the jacking point reasonably to avoid local damage of the concrete. According to the design drawings, the top surface of the jack should be arranged within the beam, or the lifting surface should be adjusted to within the beam by means of beams or longitudinal beams. If conditions permit, the jack should be arranged near the support position on the cover beam. The force-bearing surface should adopt wedge iron, with a large force-bearing area, adjust the vertical and horizontal slope of the bottom of the box girder to ensure that the jack can apply force vertically.
      4. When the space between the cover beam and the bottom of the beam cannot meet the jack layout requirements, a bearing column should be used as the back of the jack. When the pier column is not high, the bearing column should be placed on the cap, otherwise the foundation should be handled well to ensure that the strength and deformation of the foundation meet the lifting requirements. When the pier column is too high or the water pier should adopt the hoop method, the bearing column should be placed on the hoop corbel. The design of the bearing column should ensure sufficient strength and rigidity. The load-bearing column should preferentially adopt the steel pipe form.
      5. In the jacking plan, the command and dispatch, information transmission, and feedback mechanism in the jacking process should be formulated in detail to ensure that the entire process is strictly controlled. Priority should be given to the use of walkie-talkies for synchronous information transmission, and the responsibilities and division of labor of management and operators at all levels should be clearly defined.
      6. The jacking plan should clarify the emergency control measures for various risks, formulate several sets of emergency adjustment plans, implement them according to the favorable plan, and prepare according to the unfavorable plan to prevent serious quality accidents or safety accidents.
      7. The lifting plan should clarify the control methods and measures for the synchronous displacement or the difference limit during the lifting process, and supplement it with real-time monitoring and measurement of displacement, stress, strain, etc. when necessary to ensure the safety of the existing beam.

      8. The method of removing the old support and installing the new support shall be described in detail in the jacking plan. In particular, the installation process methods of the new bearing installation and the bridge construction are very different due to the constraints of different conditions in different periods. There may be local adjustments of the bearing installation method, which should be clarified in the plan.

      Basin support

      护士人妻hd中文字幕| 国产精彩视频在线观看| 一本一本久久a久久精品综合麻豆| 成人午夜福利视频镇东影视| 中文字幕精品在线视频| 幻女free性zozozoxxxxx| 三级三级三级网站网址| 天堂新版8中文在线8| chinesevideo普通话对白| 国产色秀视频在线观看| 91制片厂(果冻传媒)原档破解 | 免费一级特黄特色大片在线| 激情欧美一区二区三区| 国产成人综合久久亚洲精品| 香蕉大战欧美在线看黑人| 国产后入又长又硬| 美妇岳的疯狂迎合| 另类重口100页在线播放| 王爷晚上含奶h嗯额嗯| 亚洲色偷拍区另类无码专区| 欧美人与z0xxx另类| 亚洲一区二区三区不卡在线播放| 日本漫画免费大全飞翼全彩 | 蜜桃导航一精品导航站| 国产丰满麻豆videossexhd| 精品一区二区三区在线观看视频| 免费二级毛片免费完整视频| 欧美成人看片黄a免费看| 亚洲免费在线视频播放| 日本中文在线视频| 中文字幕亚洲综合久久| 夜爽爽爽爽爽影院| 84pao国产成视频免费播放| 国产女同在线观看| 精品国产一区二区三区久久| 免费中韩高清无专码区2021| 欧美国产日本高清不卡| 乱人伦xxxx国语对白| 成人国产精品视频| qvod激情视频在线观看| 国产精品久久久久影视不卡|